August 23, 2016: The final phase of installation for the Shirvan traffic light system will be carried out this week, starting today (August 23) until Friday (August 26).
The Division on Infrastructure and Public Utilities, THA has advised that works include the installation of mast arms, overhead signals and loops, and the operation of heavy equipment at the intersection.
The Division is urging drivers to approach the area with caution and to be mindful of the necessary traffic diversion.
For further information please contact:
The Department of Information
Office of the Chief Secretary
Tobago House of assembly
868-639-3421